|
![]() |
1) Excavate a trench about 12" deep by 24" wide for the length of the wall. 2) Fill trench with 1 1/2" processed gravel or 3/4" crusher run base material and firmly compact to a 6" thickness. 3) Place and level the first course of wall units on the base. 4) Place perforated pipe behind the wall for drainage and backfill with 3/4" crushed stone. 5) Place successive courses by stacking wall units on top of the row below. 6) Depending on the style wall, units will connect and automatically step- back with pins, a rear lip, or a tongue and groove. 7) Backfill with 3/4" crushed stone behind each course and compact. |
|
Special Considerations |
|
| Click here to order our Installation and Pattern Guide for Concrete Pavers | |
| << previous | next >> |
|
home | product gallery | photo gallery | how to install | colors with style | Patterns | Q & A | contractor's corner | designer's forum | find a dealer | contact | about us |
|
©2004 Ideal Concrete Block Company, Inc. |